The power supply of the EPR spectrometer Elexsys E580 is back from warranty repair.
Start-up operations for the commissioning of the magnet, helium temperatures and ENDOR/TRIPLE techniques in CW-mode will continue until the end of March.
21
Mar 2013
Leave a Reply
You must be logged in to post a comment.